System Optimisation for Production and CIP Processes

The customer was experiencing breakdowns in production, warnings from regulatory authorities and a non-reproducible cleaning process. In this project ZETA developed a four-stage concept (survey of existing situation, procedure, conversion of the matrix of actions into an implementation plan with cost estimates, presentation of the implementation plan) to optimise and stabilise the current production and CIP processes.

  • Product/service category: Engineering and implementation
  • Challenge of the project: design of process and process steps and implementation during full operation of the plant.

  • ZETA solutions: construction and automation works were prepared in great detail so that the 45 modifications, and requalification, could be carried out during scheduled downtime.

  • Scope of supply: basic engineering, detail engineering, process engineering, automation engineering, implementation plan for production and on-site work

  • Products: preparation systems, clean media, dispensing of acid and alkali, system control

  • Project country: Germany

  • Completion time: 17 months
 