The development of a strategy for the integration of SU equipment in existing plants for vaccine production was the focus of this project. This included the development of PFDs, the cleanroom layout, the comparison of SU equipment from different manufacturers, the media connection and the automation configuration. Furthermore, a pilot plant was integrated into the existing production.

Facts

- Product/Service Category: Process optimization, engineering and services
- Project Duration: 13 months
- Project Country: Germany
- Scope of Supply:
Process Development Support / Scale Up
Concept Design
Basic Engineering
Procurement
Construction
Automation
Qualification

Contact: Daniel Maier
Dir. Business Line Engineering & Services