ZETA supplied a downstream system for the production of antibody-drug conjugates (ADCs) and developed complex technical solutions for handling sensitive and dangerous substances. The plant includes two production lines, a general buffer preparation and storage system, a general freezing and thawing area as well as all necessary support functions.

Close
ZETA Success Stories
Whitepaper Download
Facts

- Project Duration: 18 months
- Project Country: Switzerland
- Scope of Supply:
Basic Engineering
Detail Engineering
Procurement
Construction
Qualification

Contact: Andreas Glössl
Dir. Business Line Customised Systems
We look forward
to hearing from you!
Related Success Stories
Close
ZETA Success Stories