CIP-Skid

The customer invested in a new CIP skid. ZETA carried out the detail engineering, production, installation and commissioning of the CIP skid. The project concluded with training of the operators by ZETA staff.

  • Product/service category: CIP/SIP Systems

  • The limited space available (height) required a special design of the vessels.

  • The interfaces to the CIP objects were successfully managed by means of detailed interface coordination.

  • A detailed installation plan enabled the installation to be completed within a short window in time.

  • Scope of supply: detail engineering, production, installation, commissioning, training of operators

  • Main equipment: one 2,000L CIP vessel, one 2,000L WFI vessel, filters, pumps, heat exchangers

  • Project country: Switzerland

  • Completion time: 11 months
 