Optimisation of Preparation Systems

Including System Control

This customer in Germany needed to harmonise, modernise and optimise five preparation systems including the control systems. ZETA carried out the site work in ten days in which successive sections of the plant were temporarily disconnected. The tasks included extension of a WFI loop, new piping for five preparation vessels, electrical installation and automation.

  • Product/service category: Fabrication & Assembly

  • Challenge of the project: to complete the retrofit on five processing lines within the 10-day summer shutdown.

  • ZETA solutions: all on-site work was planned in minute detail and exactly coordinated with other trades. These measures improved the processes and ensured a high level of operational reliability and cost efficiency.

  • Scope of supply: detail engineering, production, installation, automation, qualification

  • Main equipment: pumps, heat exchangers, system control

  • Project country: Germany

  • Completion time: 8 months
 